__
_____
 __

_


__  ___Purchasing Department
________

 
Advertised Bids
As a Public Institution, the Wayne State Purchasing Department of  is committed to the competitive market and to providing  fair and equal opportunity to all Vendors.  This page will serve to advertise many of our current  Requests for Quotation (RFQs) and Requests for Proposals (RFPs).  Each RFP or RFQ will list the  name of the University Contact.  A complete list of names and telephone numbers appears at the bottom of the page.

To utilize this page, click on the appropriate Category, then the RFP or RFQ you wish to see. The file should open your Microsoft Word or Adobe software and download the appropriate document.  If you are having trouble opening the file, call the corresponding University contact to make arrangements to obtain a copy.

Pre-bid and due dates listed are absolute.  Please do not respond to any 
RFPs or RFQs if the date has expired. 

 Join our LISTSERV bid list to receive notices regarding Bid Opportunities

 Register your company contact information for other contractors or subcontractors

 .
Construction
M R O
Research
Service
Technology
Furniture
Sale of Surplus
Architecture & 
 Design andCM Services
.
Construction ...... Please Note:  The University does not provide budget information as part of the pre-bid process.  Vendors should make their own preliminary assessments by obtaining drawings or reviewing them on-line when available through Dunn Blue.

.Project Labor Agreement Policy
For a list of upcoming Projects, Visit the Facilities Project List at http://www.facilities.wayne.edu/dcs/upcompro.htm
For a copy of the Wayne State University  Standard Agreement Between the University and Contractor for Construction Services applicable to:  Limited Scope Construction and Renovation Work STANDARD AGREEMENT
For a copy of the Facilities Design Standards, download them from: http://www.facilities.wayne.edu/dcs/Genin.htm
For a copy of the Standards for Communications Infrastructure, download them from: http://networks.wayne.edu/WSU-Communications-Standards.pdf
For a map to the University, click on:  http://campusmap.wayne.edu

Construction

Release 
Date
RFP
Title  (Download or Link as indicated)
Mandatory
Pre-Bid?
Pre- 
Bid 
Date
University
Contact
Quote 
Due 
Date
   
6-30-2009 WSU Project   140-157574
College of Education 2nd Floor Lighting with Ceilings - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Yes 7-8-2009 Loretta McClary
(313) 577-3731
7-16-2009
5-20-2009 WSU Project   637-10828
110 E. Warren Karmanos Building Improvements - 2009
Registration Form
Complete RFP Information to be downloaded
Addendum #1 dated 5-26-2009
Technical Specifications for Asbestos Abatement
Sign-in Sheet # 1- 2 
Addendum #2 - Minutes to Pre-bid Meeting dated 5-26-2009
Addendum #2 Drawings dated 5-26-2009
Clarification 1 Dated 6-4-2009
Bid Tabulation from 6-8-2009
Yes 5-26-2009 Kimberly
Tomaszewski
(313) 577-3757
6-8-2009
5-20-2009 WSU Project   048-135519
Cohn Building Conversion of Room 13 to Distance Learning Center - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Addendum #1 dated 5-21-2009
Sign-in Sheet # 1 - 2 
Addendum #2 - Minutes to  Prebid Meeting dated 5-29-2009
Addendum #3 dated 6-4-2009
Addendum #4 dated 6-4-2009
Bid Tabulation from 6-4-2009
Contract has been issued to Sabre Contracting LLC
Yes 5-28-2009 Robert Kuhn
(313) 577-3712
6-4-2009
5-6-2009 WSU Project    999-134979
Campus ADA Entrance Upgrades - Phase II - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Addendum #1 dated 5-7-2009
Sign-in Sheet # 1 
Addendum #2 - Minutes to the Pre-bid Meeitng dated 5-20-2009
Bid Tabulation from 5-27-2009
Yes 5-14-2009 Paula Reyes
(313) 577-3649
5-27-2009
5-01-2009 WSU Project    096-154498
Undergraduate Library Honors College Renovation - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Clarification 1 Dated 5-11-2009
Resized Drawings Clarification 1 5-11-2009
Sign-in Sheet #1 - 3
Addendum #1 - Minutes to the Prebid Meeting 5-11-2009
Addendum #2 dated 5-15-2009
Addendum #2 Drawings dated 5-15-2009
Addendum #3 dated 5-18-2009
Addendum #3 Drawings dated 5-18-2009
Bid Tabulation from 5-21-2009
Yes 5-11-2009 Valerie Kreher
(313) 577-3720
5-21-2009
4-28-2009 WSU Project    048-153159 
Cohn Learning Resources Lab 113 - 115 Renovation - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Clarification 1 Dated 5-4-2009
Revised Drawings 5-4-09
Sign-in Sheet #1 - 3
Addendum #1 - Minutes to the Prebid Meeting 5-8-2009
Clarification 2 Dated 5-8-2009
Clarification 3 Dated 5-18-2009
Bid Tabulation from 5-21-2009
Contract has been issued to Pontiac Ceiling and Partition 
Yes 5-8-2009 Robert Kuhn
(313) 577-3712
5-21-2009
4-22-2009 WSU Project    611-152414 
Lande Building Exterior Repairs - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Addendum #1 - Minutes to the Prebid Meeting 4-30-2009
Revised Section 300  5-14-2009
Bid Tabulation from 5-14-2009
Yes 4-30-2009 Robert Kuhn
(313) 577-3712
5-14-2009
4-09-2009 WSU Project    196-129495 
CJI Elevator Roof Replacement & Masonry Repairs- 2009
Registration Form
Complete RFP Information to be downloaded
Detailed Specifications  (Revised 4/14/2009)
Drawings for the Project  (Revised 4/14/2009)
Addendum #1 dated 4-14-2009
Sign-in Sheet #1
Addendum #2 - Minutes to the Prebid Meeting dated 4-16-09
Bid Tabulation from 4-30-2009
Contract has been issued to J D Candler Roofing Company
Yes 4-16-2009 Kimberly
Tomaszewski
(313) 577-3757
4-30-2009
3-19-2009 WSU Project    612-146742 
Scott Hall 2nd Floor Restroom Renovation - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1-3
Addendum #1 dated 3-25-2009
Addendum #2 - Minutes to the Prebid Meeting dated 3-25-2009
Addendum #3 dated 3-30-2009
Addendum #4 dated 3-30-2009
Bid Tabulation from 4-1-2009
Contract has been issued to Keo and Associates
Yes 3-25-2009 Valerie Kreher
(313) 577-3720
4-01-2009
1-23-2009 WSU Project    186-131618 
Forest Avenue Greenbelt Project - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1-3
Addendum #1 - Minutes to the Prebid Meeting 2-03-2009
Clarification 1 Dated 2-13-2009
Bid Tabulation from 2-24-2009
Contract will be issued to Omega Development Corporation
Yes 2-3-2009 Loretta McClary
(313) 577-373
2-24-2009
1-22-2009 WSU Project    036-142749  Re - Bid
Reuther Library Window Gasket Replacement Project - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1-3
Addendum #1 - Minutes to the Prebid Meeting 2-04-2009
Bid Tabulation from 2-23-2009
Contract has been issued to RAM Construction
Yes 2-4-2009 Loretta McClary
(313) 577-3731
2-23-2009
1-16-2009 WSU Project  # 080-152956
Matthaei Training Room Renovations
Registration Form
Complete RFP Information to be downloaded    (Revised 1/21/09)
Drawings and Detailed Specifications
Sign-in Sheet #1-2
Addendum #1 - Minutes to the Prebid Meeting 1-23-2009
Addendum #2 dated 1-27-2009
Clarification 1 Dated 1-28-2009
Clarification 2 Dated 1-28-2009
Clarification 3 dated 1-28-2009
Clarification 4 dated 1-29-2009
Bid Tabulation from 1-30-2009
Yes 1-23-2009 Robert Kuhn
(313) 577-3712
1-30-2009
1-13-2009 WSU Project  # 067-155731 
5425 Woodward Electric Service Upgrade Hazardous Material Abatement Services  - 2009
Registration Form
Complete RFP Information to be downloaded
Detailed Specifications Book
Sign-in Sheet #1
Addendum #1 - Minutes to the Prebid Meeting 1-21-2009
Bid Tabulation from 1-22-2009
Yes 1-21-2009 Robert Kuhn
(313) 577-3712
1-29-2009
1-8-2009 WSU Project   #  629-135926
Elliman Lab Renovation for Room 1145 - 2009
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1-5
Addendum #1 - Minutes to the Prebid Meeting 1-16-2009
Addendum #2 dated 1-21-2009
Clarification 1 Dated 1-23-2009
Clarification 2 Dated 1-27-2009
Addendum #3 dated 1-27-2009
Clarification 3 Dated 1-28-2009
Addendum #4 dated 1-29-2009
Bid Tabulation from 2-03-2009
Contract will be issued to DeMaria Building Company
Yes 1-16-2009 Robert Kuhn
(313) 577-3712
2-3-2009 Revised
12-8-2008 WSU Project   #  048-152328
Cohn Building / Simulation Labs Renovation - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1-3
Addendum #1 - Minutes to the Prebid Meeting 1-05-2009
Clarification 1 Dated 1-8-2009
Clarification 2 Dated 1-14-2009
Bid Tabulation from 1-22-2009
Yes 12-23-2008 Loretta McClary
(313) 577-3731
1-22-2009
12-2-2008 WSU Project    #05042, 05036, 05050, 05022, 05038, 05055, 05056 & 05059
Campus Boiler Plant Implementation Bid Package #10 - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Addendum #1 dated 12-16-2008
Addendum #2 dated 12-17-2008
Addendum #2 dated 12-17-2008 Drawings
Addendum #3 dated 12-17-2008
Addendum #4 dated 12-22-2008
Addendum #4 dated 12-22-2008 Drawings
Bid Tabulation from 12-23-2008
Contract will be issued to Great Lakes Mechanical
Yes 12-10-2008 Valerie Kreher
(313) 577-3720
12-23-2008
12-2-2008 WSU Project    007-155746, 007-157561
Construction Management Services for the:
Chemistry Building Expansion Project #007-155746 and Chemistry Building Renovation Project Phase II #007-157561
Registration Form
Complete RFP Information to be downloaded
Level of Effort Table
Sign-in Sheets #1 #2 #3
Addendum #1 dated 12-11-2008
Level of Effort Table   (Revised 12/11/08)
Addendum #2 dated 12-12-2008
Addendum #3 dated 12-18-2008
Addendum #3 dated 12-18-2008 Drawings
*Short List of Vendors - released 1-7-2009  *
Contract has been issued to DeMaria Building Company
Yes 12-9-2008 Valerie Kreher
(313) 577-3720
12-23-2008
11-26-2008 WSU Project    140-122314
Education Elevator Renovation - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheets #1 #2
Addendum #1 dated 12-17-2008
Addendum #2 dated 12-18-2008
Addendum #2 From IDS dated 12-18-2008
Clarification 1 Dated 1-5-2009
Addendum #3 dated 1-6-2009
Bid Tabulation from 1-8-2009
Yes 12-10-2008 Loretta McClary
(313) 577-3731
01-6-2009
Revised
1-8-2009
11-25-2008 WSU Project    001-151393-2
Old Main Room 3317 Renovation for Dance Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Addendum 1 and Minutes Dated 12-5-2008
Clarification 1 Dated 12-11-2008
Bid Tabulation from 12-12-2008
Contract has been issued to Envision Builders
Yes 12-3-2008 Paula Reyes
(313) 577-3649
12-12-2008
11-14-2008 WSU Project    134-152585
DeRoy Kitchen Cabinets - Phase II - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications - DeRoy Kitchen Cabinets - Phase II
Addendum 1 - Prevailing Wage Schedule Dated 11-17-2008
Addendum 2 Dated 11-19-2008 (See Addendum 3)
Addendum 3 Dated 11-19-2008
Sign-in Sheet #1
Sign-in Sheet #2
Sign-in Sheet #3
Addendum 4 and Minutes Dated 11-24-2008
Bid Tabulation from 12-3-2008
Contract has been issued to B & T General Contrracting
Yes 11-20-2008 Mike Gleason
(313) 577-3743
12-3-2008
11-3-2008 WSU Project    # 05059,05055,05041,05050,05035,05042,05036,05037,05053 and 05056
Boiler Plant Implementation - Bid Package #9 - 2008 
Registration Form
Complete RFP Information to be downloaded
Clarification 1 Dated 11-13-2008
Clarification 2 Dated 11-14-2008   Please acknowledge Clarification Two as Addendum 1 on your bid proposal form
Addendum 2 and Minutes Dated 11-19-2008
Bid Tabulation from 12-01-2008
Contract has been issued to Performance Contracting Group
No N/A
T.B.D.
11-19-2008
Loretta McClary
(313) 577-3731
11-17-2008
T.B.D.
12-01-2008
10-31-2008 WSU Project    499-140532 & 499-156230
Rackham – Phase III - Communication Science & Disorders Department – Library & Mezzanine Restoration and Renovation and Cacace Research Lab Rackham - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications - Cacace Research Lab / Basement Renovation Drawings
Drawings and Detailed Specifications - Library & Mezzanine Restoration Drawings
Sign-in Sheet #1
Sign-in Sheet #2
Sign-in Sheet #3
Addendum 1 and Minutes Dated 11-13-2008
Clarification 1 Dated 11-13-2008
Addendum 2 and Minutes Dated 11-18-2008
Bid Tabulation from 11-21-2008
Yes 11-6-2008 Mike Gleason
(313) 577-3743
11-19-2008
Revised
11-21-2008
10-20-2008 WSU Project    134-152584
DeRoy Apartments Corridor Carpet Replacement Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 10-28-2008
Addendum 1 Dated 10-28-2008
Clarification 1 Dated 10-31-2008
Bid Tabulation from 11-03-2008
Contract has been issued to Contract Design Group, Inc.
Yes 10-28-2008 Valerie Kreher
(313) 577-3720
11-03-2008
10-20-2008 WSU Project    099-134979
Campus ADA Door Operators Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 10-27-2008
Clarification 1 Dated 10-31-2008
Clarification 2 Dated 11-04-2008
Clarification 3 Dated 11-10-2008
Clarification 4 Dated 11-10-2008   (Corrects Clarification 3)
Clarification 5 Dated 11-13-2008
Addendum 1 Dated 11-18-2008
Addendum 1 - Drawings Dated 11-18-2008
Bid Tabulation from 11-21-2008
Contract has been issued to Jonathan Hiipakka Building (JHB Group)
Yes 10-27-2008 Valerie Kreher
(313) 577-3720
11-05-2008
Revised 11-11-2008
Revised 11-14-2008 (Tentative)
Revised 11-21-2008 
10-14-2008 WSU Project    068-155657
Simon Building 3rd Floor Concrete Testing, Investigation and Repair - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Addendum 1 Dated 10-15-2008
Sign-in Sheet #1
Minutes from 10-21-2008
Clarificattion 1 Dated 10-27-2008
Bid Tabulation from 10-29-2008
Contract has been issued to Ram Construction
Yes 10-21-2008 Paula Reyes
(313) 577-3649
10-29-2008
10-02-2008 WSU Project    M-1176-J
5425 Woodward Electrical Service Upgrade Rebid - 2008   (Rebid 10-02-2008)
Primary Electric Upgrade
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 10-09-2008
Addendum 1 Dated 10-15-2008
Clarificaiton 1 Dated 10-16-2008
Clarification 1  Sketch Dated 10-16-2008
Bid Tabulation from 10-22-2008
Contract has been issued to Metro Electric Engineering Technologies 
Yes 10-09-2008 Kimberly
Tomaszewski
(313) 577-3757
10-21-2008
Revised 10-22-2008
10-01-2008 WSU Project    036-142749
Reuther Library Window Gasket Replacement Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Addendum 1 Dated 10-10-2008
Addendum 1: Missing Spec's for RFP 10-07-2008
Sign-in Sheet #1
Minutes from 10-08-2008
Addendum 2 Dated 10-22-2008
Bid Tabulation from 10-29-2008
Rebid 1-22-2009
Yes 10-8-2008 Loretta McClary
(313) 577-3731
10-24-2008
Revised 10-29-2008
10-01-2008 WSU Project    130-146493
FAB Control Joint Replacement Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications   (Original)
Addendum 1 Dated 10-07-2008
Drawings and Detailed Specifications   (Revised 10/07/08)
Sign-in Sheet #1
Minutes from 10-09-2008
Addendum 2 Dated 10-13-2008
Clarification One Dated 10-14-2008
Roof Photos 10-14-2008
Addendum 3 Dated 10-13-2008
Bid Tabulation from 10-17-2008
Contract has been issued to Royal Restoration & Waterproofing
Yes 10-9-2008 Valerie Kreher
(313) 577-3720
10-17-2008
9-17-2008 WSU Project    AC08-014 
Miscellaneous Carpet & Tile Projects / Miscellaneous Campus Locations - 2008
Registration Form
Complete RFP Information to be downloaded
Sign-in Sheet #1
Minutes from 9-22-2008
Clarification One Dated 9-24-2008
Notification One dated 10-02-2008
Contract has been issued to Contract Design Group, Inc.
Yes 9-22-2008 Kimberly
Tomaszewski
(313) 577-3757
9-26-2008
9-17-2008 WSU Project    AC08-015 
Miscellaneous Blinds & Window Treatment Projects / Miscellaneous Campus Locations - 2008
Registration Form
Complete RFP Information to be downloaded
Sign-in Sheet #1
Minutes from 9-22-2008
Clarification One Dated 9-24-2008
Notification One dated 10-02-2008
Contract has been issued to Signature Designs
Yes 9-22-2008 Kimberly
Tomaszewski
(313) 577-3757
9-26-2008
9-17-2008 WSU Project    AC08-016 
Miscellaneous Excavation Flat Work & Masonry Projects / Miscellaneous Campus Locations - 2008
Registration Form
Complete RFP Information to be downloaded
Sign-in Sheet #1
Minutes from 9-22-2008
Notification One dated 10-02-2008
Yes 9-22-2008 Kimberly
Tomaszewski
(313) 577-3757
9-26-2008
9-12-2008 WSU Project    620-119583 
Bonstelle Theatre ADA Ramp Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Addendum 1 Dated 9-19-2008
Addendum 2 Dated 9-22-2008
Minutes from 9-18-2008
Bid Tabulation from 9-29-2008
Contract has been issued to Ottawa Construction
Yes 9-18-2008 Valerie Kreher
(313) 577-3720
9-29-2008
9-12-2008 WSU Project    504-146488 
Thompson House ADA Ramp Repairs and Stair Replacement Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Clarification One Dated 9-22-2008
Minutes from 9-18-2008
Bid Tabulation from 9-29-2008
Contract has been issued to Pontiac Ceiling & Partition
Yes 9-18-2008 Paula Reyes
(313) 577-3649
9-29-2008
8-28-2008 WSU Projects
Miscellaneous Trades / Miscellaneous Campus Locations - 2008 
Registration Form
Complete RFP Information to be downloaded
Cost Schedules (Form of Proposal Section 00300)
Contract have been issued to Vendors as shown in Blue
Carpentry  (AC08-001)
Gardiner Vose &
DE Maynard Contracting
Electrical   (AC08-002)
LTK ELectrical &
Industrial Electric
Plumbing  (AC08-003)
Bruner Plumbing
Mechanical  (AC08-004)
Dennis Heating & Cooling
Painting     (AC08-005)
Detroit Spectrum Painters
Gymnasium Flooring   (AC08-006)
All Court Floor Finishing
Masonry     (AC08-007)
Demolition   (AC08-008)
21 Century Salvage
Fire Suppression/Sprinklers  (AC08-009)
Fire Control Systems   (AC08-010)
Industrial Electric
Glass and Window Work  (AC08-011)
Peterson Glass Company
Asbestos and Lead Abatement  (AC08-012)
Next Generation Environment
Air Monitoring  (AC08-013)
Sign-in Sheet #1
Minutes from 9-04-2008
Clarification One dated 9-09-2008
Clarification Two dated 9-09-2008
Notification One dated 10-02-2008
Yes 9-04-2008 Kimberly
Tomaszewski
(313) 577-3757
9-11-2008
8-11-2008 WSU Project    M-05097
5425 Woodward Mechanical Service Upgrade - 2008 - (RE-BID 8-11-08)
Registration Form
Complete RFP Information to be downloaded   (RE-BID 8-11-08)
Drawings and Detailed Specifications
Clarification Dated 8-14-2008
Table of Contents 8-14-2008
Sign-in Sheet #1
Minutes from 8-18-2008
Clarification 2 dated 8-22-2008
Addendum 1 Dated 8-25-2008
Addendum 1 Drawings (8-25-2008)
Drawings Missing from original Specs (EC 7 and 8)
Clarification 3 dated 8-27-2008
Clarification 4 dated 8-28-2008
Clarification 5 dated 8-29-2008
Clarification 6 dated 9-08-2008
Addendum 2 Dated 9-12-2008
Addendum 2 Drawings (9-12-2008)
Clarification 7 dated 9-12-2008
Bid Tabulation from 9-19-2008
Contract has been issued to Macomb Mechanical
Yes 8-18-2008 Kimberly
Tomaszewski
(313) 577-3757
8-28-2008
Revised 9-02-2008
Revised 9-16-2008
Revised 9-19-2008
7-22-2008 WSU Project    # 05052 &  05060
Boiler Plant Implementation - Bid Package #8 - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Complete RFP Information to be downloaded (Revised and complete 7-25-2008)
Addendum 1 dated 7-28-2008
Sign-in Sheet #1
Minutes from 7-31-2008
Addendum 2 dated 8-13-2008
Bid Tabulation from 8-15-2008
Contract has been issued to Pipe Systems, Imc
Yes 7-30-2008 Loretta McClary
(313) 577-3731
8-15-2008
7-15-2008 WSU Project    3511-148101
Freer House Cooling Tower Replacement - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 7-24-2008
Specifications Reference
Clarification 1 dated 8-01-2008
Clarification 2 dated 8-05-2008
Bid Tabulation from 8-06-2008
Contract has been issued to Pipe Systems, Imc
Yes 7-24-2008 Kimberly
Tomaszewski
(313) 577-3757
8-06-2008
7-15-2008 WSU Project    048-148168
Cohn Roof Replacement - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 7-23-2008
Clarification 1 dated 7-24-2008
Clarification 2 dated 7-30-2008
Bid Tabulation from 7-31-2008
Contract has been issued to Schena Roofing
Yes 7-23-2008 Valerie Kreher
(313) 577-3720
7-31-2008
7-16-2008 WSU Project    080-151789 
Baseball Dugout Replacement Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications    (Original)
Addendum 1 dated 7-16-2008      (Contains Prevailing Wage Rate)
Addendum 2 dated 7-18-2008
Drawings and Detailed Specifications (Revised 7/18/08)
Sign-in Sheet #1 &  2
Addendum 3 dated 7-21-2008
Addendum 3 Drawings and Detailed Specifications dated 7/21/2008
Minutes from 7-18-2008
Addendum 4 dated 7-24-2008
Bid Tabulation from 7-25-2008
Contract has been issued to Envision Builders
Yes 7-18-2008 Paula Reyes
(313) 577-3649
7-25-2008
6-25-2008 WSU Project    060-123119 
University Services HVAC Renovation Project - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 7-02-2008
Trane Equipment and Specifications
Pre-Purchased Equipment
Clarification 1 dated 7-09-08
Bid Tabulation from 7-16-2008
Contract has been issued to Temperature Services, Inc.
Yes 7-02-2008 Paula Reyes
(313) 577-3649
7-16-2008
6-16-2008 WSU Project    062-87282 
AAB Chilled Water Piping Replacement - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Minutes from 6-23-2008
Sign-in Sheet #1 &  2
Drawings for Addendum 1 dated 6-27-2008
Addendum 1 dated 6-30-2008   (Drawings Above)
Clarification 1 dated 7-01-2008
Bid Tabulation from 7-02-2008
Contract has been issued to Macomb Mechanical Inc.
Yes 6-23-2008 Kimberly
Tomaszewski
(313) 577-3757
7-02-2008
6-16-2008 WSU Project    M-05097
5425 Woodward Mechanical Service Upgrade - 2008   (Rebid 10-02-2008)
Registration Form    (link disconnected)
Complete RFP Information to be downloaded   (link disconnected)
Drawings and Detailed Specifications    (link disconnected)
Sign-in Sheet #1 &  2    (link disconnected)
Technical Specifications    (link disconnected)
Minutes from 6-24-2008    (link disconnected)
Drawings for Addendum 1 dated 6-30-2008    (link disconnected)
Addendum 1 dated 7-09-2008   (Corrected Version) - (Drawings Above)    (link disconnected)
Clarification One dated 7-08-08    (link disconnected)
Bid Tabulation from 7-16-2008    (link disconnected)
Yes 6-24-2008 Kimberly
Tomaszewski
(313) 577-3757
7-02-2008
Revised
7-16-2008
6-12-2008 WSU Project   048-122318
Cohn Building - Elevator Renovation - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1, 2 & 3
Minutes from 6-18-2008
Clarification One dated 6-26-2008
Addendum 1 dated 7-01-2008   (Cover letter)
Addendum 1A dated 6-30-2008
Clarification Two dated 7-09-2008
Addendum 2 dated 7-09-2008
Addendum 2A Drawings dated 7-09-2008
Bid Tabulation from 7-15-2008
Contract has been issued to Kone Inc.
Yes 6-18-2008 Loretta McClary
(313) 577-3731
7-10-2008
Revised
7-15-2008
6-09-2008 WSU Project   M-1176-J 
5425 Woodward Electric Service Upgrade - 2008 WSU_M-1176-J_5425_Woodward_Electrical_Service_Upgrade_Clarification_1.doc
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1 & 2
Minutes from 6-16-2008
Clarification One dated 6-23-2008 (Due Date postponed)
Addendum 1 dated 6-24-2008  (See Below)
Drawings for Addendum 1 dated 6-24-2008
Clarification Two dated 6-24-2008
Addendum 1 dated 6-26-2008  (Identical to Clarification 1)
Bid Tabulation from 6-24-2008
Yes 6-16-2008 Kimberly
Tomaszewski
(313) 577-3757
6-24-2008
Revised
6-26-2008
5-28-2008 WSU Project   033-138431 
Parking Lot 33 Renovation - 2008
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Drawings and Detailed Specifications   (Revised to Larger Size)
Sign-in Sheet #1
Minutes from 6-05-2008   (Corrected Version)
Addendum 1 dated 6-05-2008  (Corrected Version)
Clarification One dated 6-12-2008
Bid Tabulation from 6-10-2008
Contract has been issued to Nagle Paving Company
Yes 6-05-2008 Loretta McClary
(313) 577-3731
6-19-2008
5-19-2008 WSU Project   039-139031 
Community Arts Replacement of Doors  - 2008 
Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 5-27-2008
Addendum 1 dated 5-27-2008
Clarification One dated 6-04-2008
Bid Tabulation from 6-10-2008
Contract has been issued to Envision Builders, Inc
Yes 5-27-2008 Loretta McClary
(313) 577-3731
6-02-2008
3-20-2008 WSU Project  612-125186
Scott Hall Room 1331 Renovations for C&IT Equipment  - 2008
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheets #1 & 2
Minutes from 3-27-2008
Bid Tabulation from 3-19-2008
Contract has been issued to Chezcore, Inc.
Yes 3-27-2008 Christina Radcliffe
(313) 577-3708
4-03-2008
2-27-2008 WSU Project  069-771166
Helen DeRoy Apartments Renovations / Campus Health Center Expansion - 2008
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheets #1, 2, 3, & 4
Minutes from 3-07-2008
Addendum 1 dated 3-14-2008
Bid Tabulation from 3-19-2008
Contract has been issued to Envision Builders, Inc
Yes 3-05-2008
Revised - 
3-07-2008 at 10:00 am - Same Location
Paula Reyes
(313) 577-3649
3-19-2008
2-21-2008 WSU Project   155 - 143536
5th Floor Manoogian Building Renovations   - 2008
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Asbestos Report
Lead Paint Report
Cut sheet and Installation Instructions for OneCard readers
Sign-in Sheets #1, 2, & 3
Minutes from 2-28-2008
Clarification 1 dated 3-06-2008
Clarification 2 dated 3-06-2008
Addendum 1 and related Drawings
Bid Tabulation from 3-18-2008
Yes 2-28-2008 Robert Kuhn
(313) 577-3712
3-10-2008
2-06-2008 WSU Project   40-128742 
Art Building Security Card Access  - 2008 
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheets #1
Minutes from 2-13-2008
Addendum One dated 2-18-2008
Addendum One DRAWINGS dated 2-18-2008
Clarification One dated 2-21-2008
Bid Tabulation from 2-27-2008
Contract has been issued to Electronic Security Systems, Inc.
Yes 2-13-2008 Loretta McClary
(313) 577-3731
2-20-2008
Revised
2-27-2008
1-24-2008 WSU Project   090-147353
Painting for AAB and FAB Buildings - 2008
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheets #1 & 2
Minutes from 1-28-2008
Clarification One dated 1-29-2008
Clarification Two dated 1-31-2008
Bid Tabulation from 2-06-2008
Contract has been issued to Detroit Spectrum Painters, Inc
Yes 1-28-2008 Robert Kuhn
(313) 577-3712
2-06-2008
1-24-2008 WSU Project   090-147353
Carpet for AAB and FAB Buildings - 2008
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheets #1 & 2
Minutes from 1-28-2008
Clarification One dated 1-29-2008
Clarification Two dated 1-31-2008
Bid Tabulation from 2-06-2008
Contracts have been issued to Contract Design Group
Yes 1-28-2008 Robert Kuhn
(313) 577-3712
2-06-2008
1-11-2008 WSU Project   090-147353
WSU Engineering Building - Boiler Installation - 2008
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded  (328 pages)
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 1-17-2008
Addendum One (complete) dated 1-25-2008
Bid Tabulation from 1-31-2008
Contracts have been issued to Pipe Systems Inc
Yes 1-17-2008 Valerie Kreher
(313) 577-3720
1-31-2008
1-08-2008 WSU Project   612-128744
School of Medicine Deans Suite Renovations - 2007
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
State of Michigan Application for Fire Safety Plan Examination
Sign-in Sheet #1
Minutes from 1-16-2008
Addendum One dated 1-18-2008
Clarification One dated 1-18-2008
Addendum Two dated 1-22-2008
Clarification Two dated 1-23-2008
Clarification Three dated 1-24-2008
Bid Tabulation from 1-25-2008
Contract has been issued to Envision Builders, Inc
Yes 1-16-2008 Valerie Kreher
(313) 577-3720
1-25-2008
12-06-2007 WSU Project   509-141542
Design Build Services for the Merrill Palmer/ Skillman/ Knapp Security Upgrades Project - 2007
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Addendum One dated 12-08-2007 (before the pre-bid meeting)
Sign-in Sheet #1 & 2
Minutes from 12-14-2007
Bid Tabulation from 1-02-2008
Yes 12-14-2007 Kimberly
Tomaszewski
(313) 577-3757
1-02-2008
12-06-2007 WSU Project   002-141537
Design Build Services for the WSU Campus Signage Removal of Flying W’s - 2007
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Campus map with sign symbols, 11-29-07.pdf
Addendum One dated 12-08-2007 (before the pre-bid meeting)
Sign-in Sheet #1
Minutes from 12-12-2007
Bid Tabulation from 12-18-2007
Contract has been issued to Cal Sign Company
Yes 12-12-2007 Kimberly
Tomaszewski
(313) 577-3757
12-18-2007
12-04-2007 WSU Project   016-138865
State Hall 4th Floor Unisex Restroom ADA Renovation - 2007
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Sign-in Sheet #1
Minutes from 12-11-2007
Addendum One dated 12-13-2007
Clarification One dated 12-17-2007
Bid Tabulation from 12-18-2007
Contract has been issued to Steve Ostrowitz Builders
Yes 12-11-2007 Valerie Kreher
(313) 577-3720
12-18-2007
11-14-2007 WSU Project   603-145105
Pharmacy and Health Sciences Stair Renovations - 2007
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Clarification One dated 11-21-2007
Sign-in Sheet #1 & 2
Minutes from 11-19-2007
Clarification Two dated 12-06-2007
Contract has been issued to Robert Van Kampen Co. 
Yes 11-26-2007
Revised
11-29-2007
Kimberly
Tomaszewski
(313) 577-3757
12-05-2007
Revised
12-07-2007
11-07-2007 WSU Project   07-10-2
Wayne State University- Research and Technology Park (WSU-RTP)
Tech Town Fourth Floor Buildout-2007:
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Addendum One dated 11-12-2007 (before the pre-bid meeting)
Sign-in Sheets # 1, 2 & 3
Minutes from 11-13-2007
Addendum Two dated 11-14-2007
Bid Tabulation from 11-19-2007
To be Contracted by Tech Town
Yes 11-13-2007 Valerie Kreher
(313) 577-3720
11-19-2007
10-10-2007 WSU Project   07-10-1
Wayne State University- Research and Technology Park (WSU-RTP)
Tech Town First Floor Buildout-2007: 
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Addendum One dated 10-16-2007 (before the pre-bid meeting)
Addendum Two dated 10-17-2007
Sign-in Sheets # 1, 2 & 3
Reference Drawings and Detailed Specifications  (for information purpose only).
Minutes from 10-17-2007
Clarification One dated 10-21-2007
Clarification Two (One) dated 10-24-2007
Addendum Three dated 10-24-2007
Bid Tabulation from 10-26-2007
To be Contracted by Tech Town
Yes 10-17-2007 Valerie Kreher
(313) 577-3720
10-29-2007
Revised 10-25-2007
Revised 10-26-2007
9-26-2007 WSU Project  069-771166
Campus Health Center Expansion - 2007

Order Rebid 2-27-2008
 

Yes 10-02-2007 Paula Reyes
(313) 577-3649
10-18-2007
9-28-2007 WSU Project  0048-135550
Cohn Building Renovations Room 15 Renovation to Multimedia Applications - 2007
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Tables & Seating Drawings and Specs (for informational purposes only)
Sign-in Sheets # 1, 2, 3 & 4
Minutes from 10-03-2007
Addendum One dated 10-04-2007
Addendum Two dated 10-05-2007
Clarification One dated 10-09-2007
Clarification Two dated 10-10-2007
Bid Tabulation from 10-15-2007
Contract has been issued to Construction Specialties, Inc
Yes 10-03-2007 Valerie Kreher
(313) 577-3720
10-15-2007
9-19-2007 WSU Project  016-138878 & 016-138873
State Hall Restroom Renovations and Energy Conservation  - 2007
Advertisement Information download  ....Registration Form
Complete RFP Information to be downloaded
Drawings and Detailed Specifications
Minutes from 9-27-2007
Sign-in Sheets # 1, 2, & 3
Clarification One dated 9-28-2007
Bid Tabulation from 9-20-2007
Contracts have been issued to J.R. Fiore
Yes 9-27-2007 Robert Kuhn
(313) 577-3712
10-04-2007
9-06-2007 WSU Project 507-138744
University Tower Corridor Carpet Replacement
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Detailed Specifications and  Drawings
Minutes from 9-13-2007
Addendum One dated 9-17-2007
Sign-in Sheets # 1, & 2
Clarification One dated 9-18-2007
Bid Tabulation from 9-20-2007
Contract has been issued to Contract Design Group
Yes 9-13-2007 Christina Radcliffe
(313) 577-3708
9-20-2007
9-06-2007 WSU Project 134-137350
DeRoy Apartment Kitchen Cabinet Replacement
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Drawings
Minutes from 9-13-2007
Sign-in Sheets # 1, & 2
Addendum One dated 9-13-2007
Bid Tabulation from 9-24-2007
Contract has been issued to D&B Burns Construction
Yes 9-13-2007 Christina Radcliffe
(313) 577-3708
9-21-2007
Revised 9-24-2007
8-16-2007 WSU Project 080-128274
Matthaei Academic Resource Center - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Detailed Specifications and  Drawings
Prevailing Wage Schedule (8-21-2007)
Minutes from 8-21-2007
Sign-in Sheets # 1, 2, 3, &4
Bid Tabulation from 8-30-2007
Contract has been issued to Caasti Contracting Services
Yes 8-21-2007 Valerie Kreher
(313) 577-3720
8-30-2007
8-20-2007 WSU Project 016-0138879
State Hall Corridor Painting - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Detailed Specifications and  Drawings
Sign-in Sheets # 1, 2, & 3
Clarification One dated 8-29-2007
Clarification Two dated 8-29-2007
Minutes from 8-27-2007
Clarification Three dated 8-30-2007
Bid Tabulation from 9-06-2007
Contract has been issued to Hermes Painting
Yes 8-27-2007 Robert Kuhn
(313) 577-3712
9-05-2007
8-20-2007 WSU Project  016-0138885
Design Build Services for the State Hall Lighting and Motion Sensor Project - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Cut Sheets on Various Products
Sign-in Sheets # 1 & 2
Minutes from 8-27-2007
Clarification One dated 8-29-2007
Clarification Two dated 8-30-2007
Bid Tabulation from 9-05-2007
Contract has been issued to McNulty Electrical Inc.
Yes 8-27-2007 Robert Kuhn
(313) 577-3712
9-05-2007
8-16-2007 WSU Project  606-03023
Shiffman Library Hazardous Materials Abatement - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Project Drawings
Asbestos Survey Report
Special Note regarding additional information
Sign-in Sheets # 1, 2, & 3
Minutes from 8-22-2007
Clarification One dated 8-28-2007
Bid Tabulation from 8-29-2007
Contract has been issued to Environmental Maintenance Engineers
Yes 8-22-2007 Kimberly
Tomaszewski
(313) 577-3757
8-29-2007
8-16-2007 WSU Project  611-119586
Lande Elevator Renovation - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Detailed Specifications and  Drawings
Minutes from 8-23-2007
Sign-in Sheets # 1, & 2
Bid Tabulation from 9-13-2007
Yes 8-23-2007 Loretta McClary
(313) 577-3731
9-13-2007
7-30-2007 WSU Project  155-138877 &  155-138867
Manoogian Hall Restroom Renovations and Energy Conservation - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Detailed Specifications and  Drawings.  (11 x 17)
Sign-in Sheets # 1, & 2
Minutes from 8-06-2007  Revised 8-08-2007 at 4:30 p.m.
Clarification One dated 8-08-2007
Drawings for Location of Electrical Panels
Clarification Two dated 8-13-2007
Bid Tabulation from 8-17-2007
Contract has been issued to Caasti Contracting Services
Yes 8-06-2007 Robert Kuhn
(313) 577-3712
8-17-2007
7-30-2007 WSU Project  155-138871
Manoogian Hall Corridor Lighting and Classroom Motion Sensors - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Detailed Specifications and  Drawings  (Included in the RFP)
Sign-in Sheets # 1, & 2
Minutes from 8-06-2007
Bid Tabulation from 8-17-2007
Contract has been issued to Industrial Electric
Yes 8-06-2007 Robert Kuhn
(313) 577-3712
8-17-2007
7-25-2007 WSU Project  525-133277
Oakland Center Signage Replacement Project - 2007
Advertisement Information download   ....Registration Form
Complete RFP Information to be downloaded
Detailed Specifications and  Drawings
Sign-in Sheets # 1, 2, & 3
Minutes from 7-31-2007
Clarification One dated 8-02-2007
Clarification Two dated 8-06-2007
Clarification Three dated 8-07-2007
Addendum One dated 8-08-2007
Clarification Four dated 8-08-2007
Clarification Five dated 8-08-2007
Bid Tabulation from 7-09-2007
Contract has been issued to Midwest Sign Company
Yes 7-31-2007 Valerie Kreher
(313) 577-3720
8-08-2007
___________ ___________________________________________ _________ ________ __________ ___________    
 .
.
M R O
Release
Date
RFP
Title  (Download or Link as indicated)
Mandatory
Pre-Bid?
Pre-
Bid
Date
University
Contact
Quote
Due
Date
   
6-17-2009 RFQ-Microsoft Software Campus Agreement
Full RFQ Information (to be downloaded)
Clarification 1 Dated 6-26-09
No N.A. Robin Watkins
(313) 577-3739
7-1-2009
6-17-2009 RFQ-Microsoft Software for the Student Select Program
Full RFQ Information (to be downloaded)
Clarification 1 Dated 6-26-09
No N.A. Robin Watkins
(313) 577-3739
7-1-2009
5-6-2009 RFP- Printing the Wayne Law Review 2009
Full RFP Information (to be downloaded)
Cost Schedule C
No N.A. Valerie Kreher
(313) 577-3720
5-29-2009
5-4-2009 RFP- Rope Course Climbing System for Mort Harris Recreation and Fitness Center - 2009 Re - Bid
Full RFP Information (to be downloaded)  .....Registration Form
Ceiling Drawings
Ceiling Photos
Video of Recreation Center Entrance Stairwells etc.
Sign-in Sheet 1
Minutes dated 5-19-2009
Yes 5-19-2009 Paula Reyes
(313) 577-3649
6-4-2009
3-19-2009 RFP- Scientific Gases - 2009
Full RFP Information (to be downloaded)  .....Registration Form
Clarification 1 Dated 3-25-2009
Contract will be issued to Roy Smith Company
No N.A. Robin Watkins
(313) 577-3739
3-30-2009
3-3-2009 RFP- Floor Covering for Athletics Gym - 2009
Full RFP Information (to be downloaded)  .....Registration Form
Bid Tabulation from 3-11-2009
Contract will be issued to Kiefer Specialty Flooring
No N.A. Loretta McClary
(313) 577-373
3-10-2009
12-12-2008 RFP- Water Treatment Services - 2008
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedule C1 through C4       (Revised 01-07-09)
Appendix 3 - Boiler Building Location List
Appendix 4 - Boiler Room Site Locations
URGENT Message dated 12-18-08
Sign-in Sheet 1
Sign-in Sheet 2
Minutes from 12-22-08
Addendum One (01-07-09)
Appendix 5 - Chilled Water and Makeup Water System Volumes (01/07/09)
Appendix 6 - Summary of Annual Steam Producation and Returned Condensate (01/07/09)
Clarification 1 (01/13/09)
Contract will be issued to GE Betz
Yes 12-19-2008
Postponed to 12-22-2008 at 10:00 am, same location
Mike Gleason
(313) 577-3743
01-09-2009
01-14-2009
11-5-2008 RFP- Rope Course Climbing System for Mort Harris Recreation and Fitness Center - 2008
Full RFP Information (to be downloaded)  .....Registration Form
Drawings
Ceiling Drawings
Sign-in Sheet 1
Minutes from 11-17-08
Yes 11-17-2008 Paula Reyes
(313) 577-3649
11-26-2008
10-24-2008 RFQ - 2009 - 2010 Calendar Year (Two Year) Composition Typesetting University Press 
Full RFP Information (to be downloaded)
No N.A. Valerie Kreher
(313) 577-3720
11-21-2008
10-09-2008 RFQ - 2009 - 2010 Calendar Year (Two Year) Press Short-Run Digital Printing & Binding Price Chart
Full RFP Information (to be downloaded)
No N.A. Valerie Kreher
(313) 577-3720
12-15-2008
10-09-2008 RFQ - 2009 - 2010 Calendar Year (Two Year) Offset Printing & Binding Price Chart
Full RFP Information (to be downloaded)
No N.A. Valerie Kreher
(313) 577-3720
12-15-2008
9-18-2008 RFQ - 4x4 Utility Vehicles
Full RFP Information (to be downloaded)
Clarification One (9-22-2008)
Order has been issued to John Deere / Weingarts
No N.A. Loretta McClary
(313) 577-3731
9-25-2008
7-25-2008 RFQ - Electric Utility Vehicles
Full RFP Information (to be downloaded)
Order has been issued to E-Suv
No N.A. Loretta McClary
(313) 577-3731
8-14-2008
7-18-2008 RFP - South End Newspaper Printing Services
Full RFP Information (to be downloaded)
Sign-in Sheet 1
Minutes from 7-30-08
Cost Schedule C       (Revised 8-01-2008)
Contract has been issued to Grand Blanc Printing
Yes 7-29-2008 Valerie Kreher
(313) 577-3720
8-08-2008
4-04-2008 RFP - Custodial Cleaning Equipment 
Full RFP Information (to be downloaded)
Cost Schedule C
Sign-in Sheet 1
Cost Schedule C Revised 7-1-08    (Revised 7-01-2008)
Minutes from 7-1-08
Contract has been issued to Colman Supply Company and Allied Eagle Supply Company
Yes 7-01-2008 Robert Kuhn
(313) 577-3712
7-11-2008
4-04-2008 RFQ - prepurchased Fluid Cooler Equipment (WSU Project No. 511-148101) for the University’s Freer House 
Full RFP Information (to be downloaded)
EVAPCO Drawings and Specifications
Clarification One (4-15-2008)
No N.A. Kimberly 
Tomaszewski
(313) 577-3757
4-04-2008
3-11-2008 RFQ - HVAC equipment for the University /
Full RFP Information (to be downloaded)
Clarification One (3-17-2008)
No N.A. Valerie Kreher
(313) 577-3720
3-18-2008
10-15-2007 RFP - 2008 Calendar Year Press Short-Run Digital Printing & Binding Price Chart
Full RFP Information (to be downloaded)
No N.A. Valerie Kreher
(313) 577-3720
12-14-2007
10-15-2007 RFP - 2008 Calendar Year Offset Printing & Binding Price Chart
Full RFP Information (to be downloaded)
No N.A. Valerie Kreher
(313) 577-3720
12-14-2007
10-15-2007 RFP - 2008 Calendar Year Composition Price Chart
Full RFP Information (to be downloaded)
No N.A. Valerie Kreher
(313) 577-3720
11-16-2007
10-01-2007 RFP - Janitorial Services for its’ Psychiatry Department   - 2007
Full RFP Information (to be downloaded)
Sign-in Sheets # 1 & 2
Minutes from 10-05-2007
Contract has been issued to Service Master - Tri Counties
Yes 10-05-2007 Robert Kuhn
(313) 577-3712
10-16-2007
9-24-2007 RFQ - Free Standing Mobile Platform Seating (Bleachers) for University Office of Athletics   - 2007
Full RFP Information (to be downloaded)
Contract has been issued to Interkal LLC
No N.A. Robin Watkins
(313) 577-3739
10-05-2007
9-14-2007 RFQ - Shuttle Buses for the University Office of Parking & Transportation  - 2007
Full RFP Information (to be downloaded)
Notification One (9-25-2007)
No
Optional
N.A.
9-27-2007
Loretta McClary
(313) 577-3731
9-24-2007
10-15-2007
___________ ___________________________________________ _________ ________ __________ ___________    
 . .
Research
 
Release
Date
RFP
Title  (Download or Link as indicated)
Mandatory
Pre-Bid?
Pre-
Bid
Date
University
Contact
Quote
Due
Date
   
04-15-2009 RFP - Providing Data Coordinating Center Services for the Perinatology 
Research Branch 
Full RFP Information (to be downloaded)  .....Registration Form
Appendix 3 - Data Forms: Encounter - Screening Visit & Labor & Delivery Outcomes
Taped Recording of the Prebid Meeting
 
Contract Documents issued by the National Institute of Health to Wayne State University related to this RFP
Modification of Contract 
Prime Contract Sections A - H
Prime Contract Sections I - K

Minutes of the PreProposal Meeting 4-27-2009
Questions submitted prior to the PreProposal Meeting, along with University response
Revised Cost Schedule C (Excel file)
Summary of observational trial for DCC sample
Summary of Protocol for DCC sample
RFP Template (Excel File)
Participant List from the PreProposal Meeting
Clarification 1 dated 5-22-2009
Clarification 2 dated 5-22-2009

Yes via
Conference
Call Only
4-27-09 Joan Gossman
(313) 577-3733
5-20-2009
Revised: 6-05-2009
12-11-2008 Medical and Science Stores Supplies Bid 2009
Letter of Invitation - RFQ
Cost Schedule D
(None) (None) Kenneth Doherty
(313) 577-3756
12-22-2008
1-17-2008 Science Stores Supplies (only) Bid 2007-2008
Letter of Invitation - RFQ
Cost Schedule D
(None) (None) Kimberly
Tomaszewski
(313) 577-3757
1-29-2008
12-03-2007 Medical Stores Supplies (only) Bid 2007-2008
Letter of Invitation - RFQ
Cost Schedule D
Addendum One (12-12-2007)
(None) (None) Kimberly
Tomaszewski
(313) 577-3757
12-12-2007
12-19-2007
     
___________ ______________________________________________________________ _________ ________ __________ ___________    
 .
Service
Release
Date
RFP
Title  (Download or Link as indicated)
Mandatory
Pre-Bid?
Pre-
Bid
Date
University
Contact
Quote
Due
Date
   
6-11-2009 RFP Technology for Cohn Distance Learning Room 13  Project R575135
Full RFP Information (to be downloaded)   .....Registration Form
Cost Schedule C
Appendix 4 - Drawing - Podium Work Surface
Sign-in Sheet #1
Minutes from 6-23-2009
Addendum 1 Dated 6-29-2009
Clarification 1 Dated 7-1-2009
Clarification 2 Dated 7-1-2009
Clarification 3 Dated 7-1-2009
Yes 6-23-2009 Robert Kuhn
(313) 577-3712
6-30-2009
6-2-2009 RFP Cable Installation for State Hall Classroom 314 Project R575134
Full RFP Information (to be downloaded)   .....Registration Form
Cost Schedule C
Appendix 4 - Drawing
Sign-in Sheet #1
Minutes from 6-9-2009
Addendum 1 Dated 6-11-2009
Yes 6-9-2009 Robert Kuhn
(313) 577-3712
6-16-2009
5-22-2009 RFP Audio-Visual Equipment for School of Business Administration, 
Prentis Building - Room 27 
Full RFP Information (to be downloaded)   .....Registration Form
Cost Schedule C
Sign-in Sheet #1
Minutes from 6-4-2009
Clarification 1 Dated 6-10-2009
Clarification 2 Dated 6-10-2009
Clarification 3 Dated 6-10-2009
Yes 6-2-2009 Robert Kuhn
(313) 577-3712
6-11-2009

5-22-2009
RFP Programmer/Developer Service for Implementation of a Customer
Relationship Management (CRM) Application
Full RFP Information (to be downloaded)   .....Registration Form
Sign-in Sheet #1
Minutes from 6-02-2009
Yes 6-2-2009 Joan Gossman
(313) 577-3733
6-8-2009
5-11-2009 RFP Moving Services for Dr. Novak
Full RFP Information (to be downloaded)   .....Registration Form
Appendix 3 - Departmental Inventory
Minutes from 5-18-2009
Contract has been issued to Dearborn Moving Systems (DMS)
Yes 5-18-2009 Kimberly
Tomaszewski
(313) 577-3757
6-8-2009
4-6-2009 RFI Business Machine Consolidation Study 2009
Full Request for Information (to be downloaded)(Revised 4-10-2009)
.....Registration Form
Appendix 3 - Master Schedule
Appendix 4 - FAB Floor Plans
Appendix 5 - AAB Floor Plans
Appendix 6 - Education Bldg Floor Plans
Appendix 7 - 5057 Woodward Floor Plans
Appendix 8 - Scott Hall Floor Plans
Clarification 1 dated 4-10-2009
Sign-in Sheets # 1 & 2
Minutes from 4-16-2009
Yes 4-16-2009 Joan Gossman
(313) 577-3733
5-4-2009
3-26-2009 RFP Lawn Fertilization Services - 2009 Project R575119
Full RFP Information (to be downloaded)   .....Registration Form
Sign-in Sheet # 1
Minutes from 4-3-2009
Cost Schedule C
Contract has been issued to Landscape Services, Inc.
Yes 4-3-2009 Robert Kuhn
(313) 577-3712
4-15-2009
3-10-2009 RFP Housing Summer Cleaning & Floor Care Projects - 2009 
Full RFP Information (to be downloaded)   .....Registration Form
Sign-in Sheet # 1 & 2
Minutes from 3-17-2009
Clarification 1 dated 3-19-2009
Clarification 2 dated 3-24-2009
Contract has been issued to A-Strong Cleaning Service
Yes 3-17-2009 Loretta McClary
(313) 577-3731
3-24-2009
3-4-2009 RFP Marketing Display Unit 
Full RFP Information (to be downloaded)   .....Registration Form
Sign-in Sheet # 1
Minutes from 3-13-2009
Yes 3-13-2009 Valerie Kreher
(313) 577-3720
3-27-2009
2-24-2009 RFP Moving Services for the Medical Education Commons
Full RFP Information (to be downloaded)  .....Registration Form
Appendix 3 - MEC Floor Plans
Appendix 3 - MEC Move Schedule
Appendix 3 - Shiffman Library Move Information
Appendix 3 - Scott Hall Room Assignments
Appendix 3 - MEC Move Schedule 2 
Minutes from 3-3-2009
Sign-in Sheet # 1 & 2
Clarification 1 dated 3-5-2009
Contract has been issued to Rose Moving & Storage
Yes 3-2-2009 Kimberly
Tomaszewski
(313) 577-3757
3-9-2009
1-28-2009 RFQ Cognos Support Services for C&IT 2009
Full RFP Information (to be downloaded)
Clarification 1 dated 2-03-2009
Clarification 2 dated 2-04-2009
Clarification 3 dated 2-05-2009
No None Robin Watkins
(313) 577-3739
2-11-2009
1-28-2009 RFP Commencement Ceremonies 2009 Staging and Seating Equipment
Full RFP Information (to be downloaded).(Revised 1-29-2009)....Registration Form
Appendix 3 - Matthaei Setup
Appendix 3 - Proposed Field Setup
Sign-in Sheet # 1
Minutes from 2-2-2009
Contract has been issued to Karl's Rental Center
Yes 2-2-2009 Loretta McClary
(313) 577-3731
2-6-2009
12-23-2008 RFP Housekeeping Services to the Hudson Webber Cancer Research Center (HWCRC)
Full RFP Information (to be downloaded)   .....Registration Form
Sign-in Sheet # 1 & 2
Minutes from 1-07-2009
Clarification 1 dated 1-20-2009
Bid Notice 3-23-2009
Contract will be issued to Powerlink Environmental Services LLC 
Yes 01-07-2009 Loretta McClary
(313) 577-3731
01-22-2009
11-6-2008 RFP International Mail Delivery Services - 2008
Full RFP Information (to be downloaded)   .....Registration Form
Sign-in Sheet # 1
Minutes from 11-13-2008
Clarification 1 dated 11-18-2008
Contract has been issued to Mail Services Inc.
Yes 11-13-2008 Loretta McClary
(313) 577-3731
11-24-2008
10-13-2008 RFP Moving Services for the Pediatric Prevention Research Center
Full RFP Information (to be downloaded)   .....Registration Form
Appendix 3 - Departmental Inventory
Minutes from 10-20-2008
Appendix 3 - Departmental Inventory
Contract has been issued to Dearborn Moving Systems (DMS)
Yes 10-20-2008 Kimberly
Tomaszewski
(313) 577-3757
10-27-2008
Revised 11-03-2008
10-03-2008 RFP Pest and Rodent Preventative Maintenance Services, Project R575025
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedules C
Sign-in Sheet # 1
Minutes from 10-10-2008
Clarification 1 dated 10-16-2008
Contract has been issued to Eradico
Yes 10-10-2008 Robert Kuhn
(313) 577-3712
10-20-2008
9-17-2008 RFP HVAC Preventative Maintenance for Psychiatry Dept.
Full RFP Information (to be downloaded)  .....Registration Form
Sign-in Sheet # 1
Minutes from 9-25-2008
Clarification 1 dated 10-02-2008
Clarification 2 dated 10-03-2008
Clarification 2 Revised Cost Schedule dated 10-03-2008
Contract has been issued to DJ  McConnell 
Yes 9-25-2008 Robert Kuhn
(313) 577-3712
10-8-2008
9-10-2008 RFP Scientific Equipment Maintenance for Autoclave Sterilization Equip.Rebid
Full RFP Information (to be downloaded)  .....Registration Form
Appendix 4 - Autoclave Inventory
Cost Schedule C.1 - Autoclave
Cost Schedule C.2 - Autoclave
Sign-in Sheet # 1
Minutes from 9-22-2008
Cost Schedule C.1A, C.2A, C.3, C.4 - Autoclave
Cost Schedule C.1 - Autoclave  (Revised 9/24/08)
Cost Schedule C.2 - Autoclave  (Revised 9/24/08)
Cost Schedule C.5 - Autoclave
Cost Schedule C.6 - Autoclave
Appendix 4 - Autoclave Inventory  (Revised 9/24/08)
Yes 9-18-2008
and
9-19-2008
Kimberly
Tomaszewski
(313) 577-3757
9-29-2008
8-01-2008 RFP Wast Removal Services 2008
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedules C
Sign-in Sheet # 1
Minutes from 8-13-2008
Clarification 1 dated 8-19-2008
Contract has been issued to Capital Waste, Inc.
Yes 8-13-2008 Loretta
Davis-McClary
(313) 577-3731
8-21-2008
7-14-2008 RFP Addressing/ Direct Mail Services 2008
Full RFP Information (to be downloaded)  .....Registration Form
Sign-in Sheet # 1
Minutes from 8-12-2008
Clarification 1 dated 8-19-2008
Clarification 2 dated 9-3-2008
Contract has been issued to Technicom Group
Yes 8-12-2008 Loretta
Davis-McClary
(313) 577-3731
9-8-2008
6-11-2008 RFP Pharmacy Equipment Maintenance 2008
Full RFP Information (to be downloaded)  .....Registration Form
Sign-in Sheet # 1
Clarification 1 dated 5-6-2008
Minutes from 6-24-2008
Yes 6-24-2008 Kimberly
Tomaszewski
(313) 577-3757
7-01-2008
Revised 7-10-2008
6-11-2008 RFP HR Recruiter Services for PRB  2008
Full RFP Information (to be downloaded)   .....Registration Form
Minutes from 4-24-2008
Contract has been issued to Maxim Staffing Solutions
Yes 6-18-2008 Kimberly
Tomaszewski
(313) 577-3757
7-02-2008
4-15-2008 RFP Armored Car Services 2008
Full RFP Information (to be downloaded)   .....Registration Form
Minutes from 4-24-2008
Clarification 1 dated 5-6-2008
Contract has been issued to Total Armored Car Service
Yes 4-24-2008 Kimberly
Tomaszewski
(313) 577-3757
5-9-2008
3-20-2008 RFP Express Mailing Services   - 2008
Full RFP Information (to be downloaded)   .....Registration Form
Clarification 1 dated 4-16-2008
Clarification 2 dated 4-22-2008
Contract has been issued to United Parcel Service, Inc
Yes 4-08-2008 Valerie Kreher
(313) 577-3720
4-24-2008
3-18-2008 RFP FMLA Administration Outsourcing  - 2008
Full RFP Information (to be downloaded)   .....Registration Form
Appendix 7 - FMLA Policy
Sign-in Sheet # 1
Minutes from 3-25-2008
Clarification 1 dated 4-02-2008
Clarification 2 dated 4-07-2008
Table of Paid and Unpaid Leave types (By Bargaining Group) dated 4-07-2008
Contract has been issued to ComPsych / FMLA Source
Yes 3-25-2008 Christina Radcliffe
(313) 577-3708
4-08-2008
Revised 4-10-2008
2-27-2008 RFP Moving Services for Manoogian Department Relocation Project - 2008
Full RFP Information (to be downloaded)  .....Registration Form
Sign-in Sheets # 1 & 2
Center for Urban Studies (CUS) Floor Plan for Clarification 1
Minutes from 3-03-2008, and Clarification 1 (2)
Contract has been issued to Rose Moving & Storage
Yes 3-03-2008 Robert Kuhn
(313) 577-3712
3-10-2008
2-20-2008 RFP On Line Reprint Order Fulfillment System - 2008
Full RFP Information (to be downloaded)  .....Registration Form
Sign-in Sheets # 1
Minutes from 2-27-2008
An award has been made to Hite Photo
Yes 2-27-2008 Robert Kuhn
(313) 577-3712
3-07-2008
2-15-2008 RFP Student Group Accident and Sickness Insurance Program
Full RFP Information (to be downloaded).....Registration Form
Clarification_One dated 2-28-2008
WSU Assorted Brochures
Claims Report
Participation Sheet - Prebid Meeting
2007-2008 Brochures for Domestic and International Students
Minutes from 2-29-2008
Clarification_Two dated 3-07-2008
Clarification_Three dated 3-14-2008
* Short List of Vendors - released 4-04-2008  *
An award has been made to Aetna Student Health
Yes 2-29-2008 Paula Reyes
(313) 577-3649
3-17-2008
2-08-2008 RFP Moving Services for the C. S. Mott Center Phase II Project - 2008
Full RFP Information (to be downloaded)   .....Registration Form
Sign-in Sheets # 1
Minutes from 2-18-2008
Revised Cost Schedule 2-22-2008
Contract has been issued to DMS Moving & Storage
Yes 2-18-2008 Robert Kuhn
(313) 577-3712
2-25-2008
1-30-2008 RFP Management of Biological Materials for the Perinatology Research Branch 
Full RFP Information (to be downloaded)  .....Registration Form
Clarifications and Minutes from 2-08-2008
Contract has been issued to Fisher Bioservices, Inc.
Yes 2-08-2008 Joan Gossman
(313) 577-3733
2-28-2008
1-29-2008 RFP Telephone Financial Analysis Consulting to the University  - 2008
Full RFP Information (to be downloaded) .....Registration Form
Sign-in Sheets # 1
Minutes from 2-05-2008 and Clarification One
Clarification_Two dated 2-12-2008
Clarification_Three dated 2-15-2008
Contract has been issued to The Northridge Group, Inc.
Yes 2-05-2008 Valerie Kreher
(313) 577-3720
2-15-2008
12-20-2007 RFP Clerical Testing for the University’s Employment Services Department  - 2008 
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedules C
Minutes from 1-08-2008
Clarification_One dated 1-16-2008
Clarification_Two dated 1-16-2008 (Corrects Clarification One)
.Letter of Postponement 4-14-2008
Contract has been issued to Kenexa Technology
Yes 1-08-2008 Kimberly
Tomaszewski
(313) 577-3757
1-18-2008
9-17-2007 RFP Janitorial / Custodial Supplies & Services  - 2007
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedules C
Join Janitorial Supply Listserv Bid List
Sign-in Sheets # 1, 2, 3, 4, & 5
Minutes from 9-04-2007
Clarification_One dated 10-02-2007
Clarification_Two dated 10-05-2007
Contract has been issued to Paperworks Incorporated
Yes 9-26-2007 Loretta McClary
(313) 577-3731
10-04-2007
8-28-2007 Re-Bid Restaurant Cleaning & Inspection Services - 2007.
Full RFP Information (to be downloaded)   .....Registration Form
Minutes from 9-04-2007
Addendum_One dated 9-10-2007
Clarification_One dated 9-14-2007
Sign-in Sheets # 1 & 2
Fire Inpections Contract has been issued to Fire Systems of Michigan
Ventilation Cleanup Contract has been issued to ISC Services, Inc.
Grease Trap Cleanng Contract has been issued to Kay Logic Inc.
Yes 9-04-2007 Loretta McClary
(313) 577-3731
9-11-2007
Revised 9-14-2007
8-22-2007 RFP U.S. Study Abroad Insurance Program  - 2007
Full RFP Information (to be downloaded) .....Registration Form
Cost Schedules C  (Included in the RFP)
Minutes from 8-31-2007
Clarification_One dated 9-10-2007
Contract has been issued to HTH Worldwide Insurance Services
Yes 8-31-2007 Kimberly
Tomaszewski
(313) 577-3757
9-14-2007
8-06-2007 RFP First Class Presorting Services  - 2007
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedules C
Sample Flats Billing Spreadsheet  (From 2006 RFP)
Minutes from 8-16-2007
Clarification_One dated 8-20-2007
Contract has been issued to Econ Marketing Services
Yes 8-16-2007 Loretta McClary
(313) 577-3731
8-28-2007
7-13-2007 RFP Campus Shuttle Services  - 2007
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedules C  (Included in the RFP)
Main Campus Shuttle Route
Sign-in Sheets # 1, 2, & 3
Minutes from 7-20-2007
Clarification_One dated 7-26-2007
Contract has been issued to Commuter Express
Yes 7-20-2007 Loretta McClary
(313) 577-3731
7-31-2007
7-06-2007
RFP Pest And Rodent Preventative Maintenance Services, Project R575025 - 2007
Full RFP Information (to be downloaded)  .....Registration Form
Cost Schedules C
Sign-in Sheets # 1 & 2
Minutes from 7-24-2007
Clarification_One dated 8-09-2007
Clarification_Two dated 8-13-2007
Contract has been issued to Terminex International 3-18-2008
Yes 7-24-2007 Robert Kuhn
(313) 577-3712
8-10-2007
___________ ______________________________________________________________ _________ ________ __________ ___________    
 .
Technology
Release
Date
RFP
Title  (Download or Link as indicated)
Mandatory
Pre-Bid?
Pre- 
Bid 
Date
University
Contact
Quote
Due
Date
   
7-2-2009 RFP - Design Build Services for Public Safety PTZ Cameras, Project 999 - 164354 
Full RFP Information to be downloaded ......Registration Form
Yes 7-9-2009 Robert Kuhn
(313) 577-3712
7-17-2009
6-4-2009 RFP - Systems Biology of Epilepsy Project (SBEP) Database System 
Full RFP Information to be downloaded ......Registration Form
Cost Schedules C
Sign-in Sheet #1
Minutes from 6-17-09
Clarification 1 Dated 6-26-2009
Yes 6-17-2009 Robin Watkins
(313) 577-3739
6-30-2009
5-8-2009 RFP - Institution-Wide Digital Signage Solution 
Full RFP Information to be downloaded ......Registration Form
Sign-in Sheet #1 - 2
Minutes from 5-20-2009
Cost Schedules C  (Revised 5-22-2009)
Clarification 1 Dated 5-28-2009
Clarification 2 Dated 6-04-2009
Yes 5-20-2009 Joan Gossman
(313) 577-3733
6-11-2009
4-30-2009 RFP - Computer Cluster 2009
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Sign-in Sheet #1 - 2
Minutes from 5-18-2009
Clarification 1 Dated 5-27-2009
Yes 5-18-2009 Joan Gossman
(313) 577-3733
5-29-2009
3-27-2009 RFP - Audio Visual Equipment Rental for Commencements, Project R575124
Full RFP Information to be downloaded ......Registration Form
Price Summary
Drawings
Sign-in Sheet # 1
Minutes from 4-01-2009
Clarification 1 Dated 4-06-2009
Contract has been issued to Sound Planning Communications
Yes 4-1-2009 Robert Kuhn
(313) 577-3712
4-8-2009

2-11-2009
RFP- UPS for MDF at Scott Hall, School of Medicine, Project R575113
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C   (Revised)
Sign-in Sheet # 1 & 2
Minutes from 2-17-2009
Clarification 1 Dated 2-18-2009
Clarification 2 Dated 2-19-2009
Clarification 3 Dated 2-19-2009
Clarification 4 Dated 2-19-2009    (Includes drawings)
Clarification 5 Dated 2-23-2009
Contract has been issued to AIG Associates
Yes 2-17-2009 Robert Kuhn
(313) 577-3712
2-24-2009
1-21-2009 RFP- Penetration Testing 2009
Full RFP Information to be downloaded ......Registration Form
Sign-in Sheet #1 - 2
Minutes from 2-2-2009
Clarification 1 Dated 2-10-2009
Contract has been issued to Viopoint, Inc.
Yes 2-2-2009 Paula Reyes
313) 577-3649
2-13-2009

11-19-2008
RFP- Audio Visual Equipment for School of Business Adm., Rm.523 Oakland Center,
Project R575108
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Sign-in Sheet #1
Minutes from 11-25-2008
Order has been issued to Innovative Communications
Yes 11-25-2008 Robert Kuhn
(313) 577-3712
12-8-2008
11-05-2008 RFQ - Juniper Hardware Maintenance Plan
Full RFP Information to be downloaded  (No Longer Available)
Clarification_One dated 11-10-2008
Clarification_One - Entitlement Details
Clarification_One - Price Summary    (No Longer Available)
Clarification_Two dated 11-10-2008
Order has been issued to Suntel Services
None N/A Robert Kuhn
(313) 577-3712
11-12-2008
10-31-2008 RFP - Banner Server for the University Computing & Information Technology Division
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Appendix 3 - Statement of Work IV.6.1 CPU
Appendix 4 - Statement of Work IV.6.2 Memory
Minutes from 11-07-2008
List of Attendees to the Prebid Meeting
RevisedCost Schedule C
Clarification_One dated 11-11-2008
Clarification_Two dated 11-12-2008
Clarification_Three dated 11-14-2008
Clarification_Four dated 11-19-2008
Clarification_Five dated 11-21-2008
Clarification_Six dated 11-24-2008
Clarification_Seven dated 11-24-2008
Clarification_Eight dated 11-25-2008
Contract has been issued to Dewpoint, Inc.
Yes 11-7-2008 Valerie Kreher
(313) 577-3720
11-21-2008

10-14-2008
RFP - New MDF Fiber Riser Cable at the Scott Hall Building (School of Medicine) located at 540 East Canfield Street, Detroit, Michigan  Project 575104
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Details Fiber Patch Panels #1 through #7
Sign-in Sheet #1
Minutes from 10-22-2008
Order has been issued to The Data Comm Group
Yes 10-22-2008 Robert Kuhn
(313) 577-3712
10-29-2008
10-10-2008 RFP - Customer Relationship Management System  - 2008 
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Minutes from 10-17-2008
Sign-in Sheet #1
Yes 10-17-2008 Joan Gossman
(313) 577-3733
10-30-2008

10-10-2008
RFP-Audio Visual Equipment for Learning Lab in University Libraries
(Project R0081713/ 81728) 
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Addendum 1 Dated 10-14-2008
Addendum 2 Dated 10-15-2008 (corrects Addendum1)
Sign-in Sheet #1
Minutes from 10-30-2008 
Cost Schedule C  (Revised 10-30-2008)
Floor Plans of the Learning Lab   (PDF)
Entire Floor Plans including the Learning Lab   (CAD)
  Instructions for Printing PDF to Scale
Clarification One dated 11-04-2008
Clarification Two dated 11-05-2008
Yes 10-30-2008 Robert Kuhn
(313) 577-3712
11-10-2008

10-10-2008
RFP-Data and Telecommunications Cable Installation at Computing Services Center Building, 5925 Woodward, Mezzanine Area (Project R575103)
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Drawings
Sign-in Sheet #1
Minutes from 10-22-2008 
SOW_217_floor_plan.pdf
Contract has been issued to Amcomm Telecommunications
Yes 10-22-2008 Robert Kuhn
(313) 577-3712
10-29-2008
8-26-2008 RFP - Audio Visual Equipment for School of Medicine Commons 608-03023
Full RFP Information to be downloaded ......Registration Form
Detailed Specifications
Drawings
Cost Schedule C
Sign-in Sheet #1
Clarification One (9-11-2008)
Minutes from 9-15-2008
Clarification Two (9-22-2008)
Clarification Three (9-23-2008)
Order has been issued to Audio Visual Innovations
Yes 9-10-2008 Robert Kuhn
(313) 577-3712
9-24-2008
7-22-2008 RFP - Cabling Services for State Hall Classrooms -  Project R575083 - 2008
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Clarification One (7-29-2008)
Sign-in Sheet #1
Minutes from 7-31-2008
Cost Schedule C    (Revised 7-31-2008)
Clarification Two (8-08-2008)
Cost Schedule C    (Revised 8-08-2008)
Clarification Three (8-08-2008)
Clarification Four (8-11-2008)
Cost Schedule C    (Revised 8-11-2008)
Contract has been issued to Abel Electronics, Inc.
Yes 7-30-2008 Robert Kuhn
(313) 577-3712
8-11-2008
7-21-2008 RFP - AV Equipment for Classrooms in Manoogian and State Hall Project R575080 - 2008 
Full RFP Information to be downloaded ......Registration Form
Cost Schedule C
Scope of work for Manoogian
Scope of work for State Hall
Sign-in Sheet #1
Minutes from 7-25-2008
Contract has been issued to Audio Visual Innovations, Inc.
Yes 7-24-2008 Robert Kuhn
(313) 577-3712
7-31-2008
7-02-2008 RFP - Zimbra Collabortation Suite Hosted Email Service - 2008
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C   (Revised 7-15-2008)
Sign-in Sheet #1
Minutes from 7-14-2008
Clarification One (7-15-2008)
Cost Schedule C   (Revised 7-15-2008)
Contract has been issued to Merit Network, Inc.
Yes 7-14-2008 Joan Gossman
(313) 577-3733
7-24-2008
6-16-2008 RFP - HDTV Videoconferencing and Presentation System, for it’s State Hall Building and Computer Science Department - 2008
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Sign-in Sheet #1
As-Build Drawings
Minutes from 6-26-2008
Clarification One (7-02-2008)
Clarification Two (7-02-2008)
Contract has been issued to Innovative Communications, Inc.
Yes 6-26-2008 Robert Kuhn
(313) 577-3712
7-08-2008
6-13-2008 RFP - Boiler Certification Services Project R575077 - 2008 
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Appendix 3 Campus Boiler Equipment List
Campus Boiler Building List
Campus Boiler Campus Map
Sign-in Sheets # 1 & 2
Minutes from 6-20-2008
Contract has been issued to Detroit Boiler Company
Yes 6-20-2008 Robert Kuhn
(313) 577-3712
7-08-2008
6-02-2008 RFP - Multimedia System for the College of Pharmacy  - 2008 
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Sign-in Sheet #1
Minutes from 6-05-2008
Clarification One (6-10-2008)
Contract has been issued to Innovative Communications
Yes 6-05-2008 Robert Kuhn
(313) 577-3712
6-16-2008
4-25-2008 RFP - Customer Relationship Management System  - 2008 
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Sign-in Sheet #1
Minutes from 5-05-2008
Clarification One (5-16-2008)
Yes 5-05-2008 Joan Gossman
(313) 577-3733
5-30-2008
4-09-2008 RFP - Multimedia System for Public Safety Headquarters  - 2008 
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Epson 1825 LCD Projector
Epson Pro Series G5200W IG v1.6.pdf 
Epson Pro Series G5350 IG v1.6.pdf
Sign-in Sheet #1 & 2
Minutes from 4-16-2008
Yes 4-16-2008 Robert Kuhn
(313) 577-3712
4-23-2008
4-02-2008 RFP - Data and Telecommunications Cable Installation at the DeRoy Apartment Building  - 2008 
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Diagrams for the RFP
Sign-in Sheet #1 & 2
Minutes from 4-11-2008
Yes 4-11-2008 Robert Kuhn
(313) 577-3712
4-18-2008
3-14-2008 RFQ - Purchase of Tape Library hardware  - 2008 
Full RFP Information to be downloaded  ......Registration Form
Connection Diagram for the RFP
Clarification One (3-25-2008)
Clarification Two (3-26-2008)
Contract has been issued to Logicalis
No N / A Valerie Kreher
(313) 577-3720
3-28-2008
2-28-2008 RFP - Room Scheduling & Event Management  - 2008
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Minutes from 3-07-2008
Contract has been issued to Ad Astra
Yes 3-07-2008 Valerie Kreher
(313) 577-3720
3-21-2008
11-28-2007 RFP - HD Videoconferencing and Presentation System - 2007
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Sign-in Sheet #1 & 2
Minutes from 12-04-2007
Clarification One (12-04-2007)
Cost Schedule C    (Revsed 12-07-2007)
Contract has been issued to Innovative Communications Inc.
Yes 12-04-2007 Robert Kuhn
(313) 577-3712
12-11-2007
11-16-2007 RFP - Computer Storage Capacity for the University Computing & Information Technology Division - 2007
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Current Back-up Configuration (updated from pictures passed out at the prebid meeting)
Sign-in Sheet #1 & 2
Clarification Two (12-04-2007).
Clarification One (12-04-2007)
Minutes from 11-30-2007
Clarification Three (12-06-2007)
Clarification Four (12-07-2007)
Contract has been issued to Berbee Information Networks
Yes 11-30-2007 Valerie Kreher
(313) 577-3720
12-12-2007
11-14-2007 RFP - VM-Ware for the University Computing & Information Technology Division - 2007
Full RFP Information to be downloaded  ......Registration Form
Cost Schedule C
Sign-in Sheet #1 & 2
Revised Minutes from 11-28-2007(Includes Clarification Statement)
Clarification One (12-05-2007)
Yes 11-28-2007 Valerie Kreher
(313) 577-3720
12-10-2007
8-10-2007 RFP - HDTV Videoconferencing and Presentation System - 2007 
Full RFP Information to be downloaded  ......Registration Form
Equipment Drawings
Cost Schedule C
WSU-furnished equipment (OFE)
Sign-in Sheet #1
Minutes from 8-08-2007
Clarification One (8-22-2007)
Order for equipment has been issued to Innovative Communications
Yes 8-15-2007 Robert Kuhn
(313) 577-3712
8-31-2007
08-29-2006
(revised)
8-03-2007 RFP - SUN Hardware Maintenance Requirements. - 2007
Full RFP Information to be downloaded  Revised 8-08-2007  ......Registration Form
Equipment List and Cost Schedule C
Order has been issued to Service Express, Inc.
None N / A Cynthia Branch (313) 577-4567 8-15-2007
7-27-2007 RFP - Rebid - Anti-theft and Security Equipment, for Computer Equipment, Project R575027
Full RFP Information to be downloaded ......Registration Form
Revised Cost Schedule C
Sign-in Sheets from 8-08-2007 and 3-28-2007
Minutes from 8-08-2007
Contract has been issued to LockDownIt LLC
Yes 8-08-2007 Robert Kuhn
(313) 577-3712
8-23-2007
___________ ______________________________________________________________ _________ ________ __________ ___________    
 . .  .
Furniture
Release
Date
RFP
Title  (Download or Link as indicated)
Mandatory
Pre-Bid?
Pre-
Bid
Date
University
Contact
Quote
Due
Date
   
6-26-2009 RFP Rackham Phase III Renovation Project Furniture 2009
Full RFP Information to be downloaded .......Registration Form
Cost Schedule C
Appendix 3 - Furniture Detailed Specifications
Yes 7-7-2009 Valerie Kreher
(313) 577-3720
7-16-2009
6-18-2009 RFP State Hall Lecture Hall Furniture 2009
Full RFP Information to be downloaded .......Registration Form
Cost Schedule C
Appendix 3 - Furniture Detailed Specifications - pdf version
Appendix 3 - Furniture Detailed Specifications - word document
Appendix 4 - Drawings
Sign-in Sheets #1
Minutes dated 6-29-2009
Yes 6-29-2009 Valerie Kreher
(313) 577-3720
7-10-2009
5-22-2009 RFP Honors College Furniture 2009
Full RFP Information to be downloaded .......Registration Form
Appendix 3 - Honors College Floor Plan & Detailed Specifications
Cost Schedule C
Sign-in Sheets #1 - 2
Minutes dated 6-4-2009
Clarification One 6-9-2009
Yes 6-4-2009 Valerie Kreher
(313) 577-3720
6-12-2009
5-20-2009 RFP Undergraduate Library Compact Shelving Project REVISED - 2009
Full RFP Information to be downloaded .......Registration Form
Appendix 3 - Basement Floor Plan - Undergraduate Library- (not yet available)
Drawings of the Library Basement Shelving
Clarification One 5-26-2009
Sign-in Sheets #1
Addendum #1 - Pre- Bid meeting Minutes dated 6-1-2009
Addendum #2 dated 6-1-2009
Addendum #3 dated 6-4-2009
Addendum #4 dated 6-9-2009
Yes 5-28-2009 Valerie Kreher
(313) 577-3720
6-5-2009
5-20-2009 RFP Custom Benches for the Business School 2009
Full RFP Information to be downloaded .......Registration Form
Sign-in Sheet #1
Minutes dated 6-2-2009
Yes 6-2-2009 Valerie Kreher
(313) 577-3720
6-9-2009
5-14-2009 RFP Honors College Reconfiguration Project 2009 
Full RFP Information to be downloaded .......Registration Form
Appendix 3 - Second Floor Plan - Undegraduate Library
Sign-in Sheets #1
Appendix 3 - Second Floor Plan - Undegraduate Library   (CAD Version)
Clarification One 5-22-2009
Minutes dated 5-21-2009
Contract has been issued to Consumer Office Furniture
Yes 5-21-2009 Valerie Kreher
(313) 577-3720
6-5-2009
3-5-2009 RFP Undergraduate Library Compact Shelving Project 2009
Full RFP Information to be downloaded .......Registration Form
Appendix 3 - Basement Floor Plan - Undergraduate Library
Addendum #1 dated 3-5-2009
Sign-in Sheets #1 & 2
Minutes from 3-16-2009
Addendum #2 dated 3-17-2009
CAD Drawings     (CAD Version)
Clarification One 3-23-2009
Clarification Two 3-24-2009
Clarification Three 3-25-2009
Bid Tabulation from 3-30-2009
RFP Terminated Notification 5-11-2009
Yes 3-16-2009 Valerie Kreher
(313) 577-3720
3-30-2009
11-19-2008 WSU- Furnishings for Study Abroad Program - 2008
Full RFP Information to be downloaded .......Registration Form
Cost Schedule C
Detailed Furniture Specifications (Appendix 3)
Drawings (Appendix 5)
Sign-in Sheets #1 & 2
Minutes from 12-3-2008
Shelving
Drawings for WS-1 WS-2 PO-1 and PO-2
Clarification One 12-10-2008       (Revised 12-10-2008)
Drawings (Appendix 5)      (CAD Version)
Contract has been issued to Interior Environments
Yes 12-3-2008 Valerie Kreher
(313) 577-3720
12-17-2008
08-07-2008 WSU- State Hall Curved Lecture Hall Furniture 2008
Full RFP Information to be downloaded .......Registration Form
Detailed Specifications and  Drawings
Cost Schedule C and Detailed Specifications
Sign-in Sheets #1 & 2
Minutes from 8-19-2008
AutoCAD drawings in 2006 format
  101 D015413_00_00_L03_F.dwg 
  106 206 306 234 334 D015413_00_00_L04_F.dwg
Corrected Spec's due to formatting problems (no change to content)
Clarification / Addendum_One 8-2-2008
Clarification Two 8-27-2008
Clarification Three 8-29-2008
Contract has been issued to Airea
Yes 08-22-2008 Valerie Kreher
(313) 577-3720
09-04-2008
08-07-2008 WSU- Furnishings for the Richard J. Mazurek M.D. Medical Education Commons-School of Medicine
Full RFP Information to be downloaded .......Registration Form
Detailed Specifications and  Drawings
Cost Schedule C and Detailed Specifications
Sign-in Sheets #1 & 2
Cost Schedule C and Detailed Specifications   (Revised 8-20-2008)
Minutes from 8-19-2008
Link to CAD Drawings   (Link 1)
Link to CAD Drawings   (Link 1)
Clarification One 8-22-2008
Clarification Two 9-04-2008
Contracts has been issued to:
Airea (Category 1)
Lincoln Office Solutions (Categories 2 & 6)
Creative Office Interiors (Category 7)
Interior Environments (Categories 3, 4, & 5)
Yes 08-19-2008 Valerie Kreher
(313) 577-3720
09-04-2008
07-24-2008 WSU- Furnishings for State Hall Classroom Renovation Project - Lounge Furniture
Full RFP Information to be downloaded .......Registration Form
Detailed Specifications and  Drawings
Cost Schedule C and Detailed Specifications
Sign-in Sheets #1 & 2
Minutes from 7-31-2008
Contract for Lounge Furniture has been issued to Lincoln Office Solutions
Contract for Classroom Furniture has been issued to Krueger International (KI)
Yes 07-31-2008 Valerie Kreher
(313) 577-3720
08-13-2008
06-16-2008 WSU- Mobile & Fixed Shelving for Medical Education Commons 
Full RFP Information to be downloaded .......Registration Form
Detailed Specifications and  Drawings
Sign-in Sheets #1 & 2
Minutes from 6-23-2008
Clarification One 6-24-2008
Addendum One 6-24-2008
Bid Tabulation 6-27-2008
Order has been issued to the The Casper Corporation
Yes 06-23-2008 Valerie Kreher
(313) 577-3720
06-27-2008
04-22-2008 WSU- Office Furniture for Engineering Development Center
Full RFP Information to be downloaded .......Registration Form
Cost Schedule C and Detailed SpecificationsRevised 4-30-2008
Floor Plans of the Engineering Development Center
Clarification One 4-30-2008
Sign-in Sheets #1
Minutes from 5-2-2008
  • To open the CAD File, follow these steps:
    • Start AutoCAD 
    • Go to File, Open 
    • When the ‘select file’ dialog box opens, copy and paste the link into the box that says ‘file name:’ 
    • Hit the ‘Open’ button 
    • The drawing should open at this point… 
    Clarification Two 5-2-2008
    Clarification Three 5-7-2008
    Clarification Four 5-13-2008
    Clarification Five 5-19-2008
    Cost Schedule C3 Revised 5-19-2008
    Order has been issued to the Airea, Inc.
    YES 05-02-2008 Valerie Kreher
    (313) 577-3720
    05-22-2008
    09-05-2007 Office Furniture for the Public Safety Department
    Full RFP Information to be downloade. ......Registration Form
    Cost Schedule C and Detailed Specifications
    Floor Plans of the 6050 First & Second Floors  (pdf) (Revised 8-24-2007)
    Floor Plans of the 6050 First Floor  (DWG - to open, follow the steps below)  (Revised 9-13-2007)
    http://www.forms.purchasing.wayne.edu/Adv_bid/rfp_public_safety_furniture_2007_first_floor_Plans.dwg
    Floor Plans of the 6050 Second Floor  (DWG - to open, follow the steps below)   (Revised 9-13-2007)
    http://www.forms.purchasing.wayne.edu/Adv_bid/rfp_public_safety_furniture_2007_second_floor_plans.dwg
  • To open the CAD File, follow these steps:
    • Start AutoCAD 
    • Go to File, Open 
    • When the ‘select file’ dialog box opens, copy and paste the link into the box that says ‘file name:’ 
    • Hit the ‘Open’ button 
    • The drawing should open at this point… 
    Sign-in Sheets #1 & 2
    Minutes from 9-11-2007
    Clarification One 9-14-2007
    Clarification Two 9-17-2007
    Clarification Three 9-18-2007
    Clarification Four 9-19-2007
    Clarification Five 9-20-2007
    Order for chairs has been issued to Kentwood Office Furniture
    Order for Workstations has been issued to Balco Interiors
    YES 09-11-2007 Valerie Kreher
    (313) 577-3720
    09-25-2007
    08-09-2007 New Dispatch Furniture Consoles for the Public Safety Department
    Full RFP Information to be downloaded.  ......Registration Form
    Cost Schedule C
    Drawing of the 6050 Dispatch Floor Installation Area  (pdf)
    Drawing of the 6050 Dispatch Floor Installation Area  (CAD) (Revised 8-16-2007)
    Sign-in Sheet #1
    Minutes from 8-15-2007
    Clarification One 8-30-2007
    Clarification Two 9-05-2007
    Order for equipment has been issued to Watson Furniture Group
    Valerie Kreher
    (313) 577-3720
    08-15-2007 Valerie Kreher
    (313) 577-3720
    08-27-2007
       
    ___________ ______________________________________________________________ _________ ________ __________ ___________    
     .  .  .  .

    .
    Sale of Surplus University Property

    Release
    Date
    The attached list of University Property has been declared as surplus.  Wayne State University invites you to participate in the Request for Bid process to purchase this property from the University.  Please review the bid information below:

    Title  (Download or Link as indicated)

    Mandatory
    Pre-Bid?
    Pre-
    Bid
    Date
    University
    Contact
    Quote
    Due
    Date
       
    4-3-2009 Surplus Vehicles and Surplus Items
    Full Sale Information to be downloaded
    No None Joan Gossman
    (313) 577-3733
    4-17-2009
    4-12-2007 RFB Surplus Equipment related to the Forest Apartments HVAC Renovations
    Full RFP Information to be downloaded......Registration Form
    Optional 4-18-2007 Ken Doherty
    (313) 577-3756
    4-23-2007
    3-08-2007 Surplus FP&M Grounds Dept. Surplus Items 
    Full Sale Information to be downloaded......
    Optional As Scheduled Kent Bolt
    (313) 577-6265
    3-23-2007
       
    ___________ ______________________________________________________________ _________ ________ __________ ___________    
     .  .  .
    Architecture / Design and CM Services
    Release
    Date
    RFP
    Title (Download or Link as indicated)
    Mandatory
    Pre-Bid?
    Pre-
    Bid
    Date
    University
    Contact
    Quote
    Due
    Date
       
    2-19-2007 RFP - Construction Management Services for the Engineering Development Center  WSU_090-05007
    Advertisement Information download  .....Registration Form
    Full RFP Information
    Work PLan - Fee Schedule C
    Yes 2-26-2007 Kimberly
    Tomaszewski
    3-07-2007
    ___________ ______________________________________________________________ _________ ________ __________ ___________    
     .  .  .
    Our Team of Purchasing Professionals
    Cynthia Branch
    577-3739
    Joan Gossman
    577-3733
    Kim Tomaszewski
    577-3757
    Loretta Davis 577-3731 Val Kreher 577-3720 Robin Watkins 577-4567
    Ken Doherty  577-3756 Bob Kuhn  577-3712
    Mike Gleason
    577-3743
    Paula Reyes
    577-3649
     

    _________________

    __________
     _________________  __________  _________________ __________

    Telecommunication Wiring Standards 12-2004

    List of Vendors Debarred from Federal Contracts
     

    Pending
    Release
    RFP
    Title (Download or Link as indicated)
    Mandatory
    Pre-Bid?
    Pre-
    Bid
    Date
    University
    Contact
    Quote
    Due
    Date